晁立中
|
專長
|
專長 |
1 |
營建專案管理 |
2 |
工程標價決策 |
3 |
施工技術評估 |
授課領域
|
領域 |
1 |
營建決策分析 |
2 |
工程規劃與控制 |
3 |
營建工程估價 |
學歷
|
畢業學校 |
主修學門系所 |
學位 |
1 |
美國普渡大學 |
土木工程系 |
博士 |
2 |
美國普渡大學 |
土木工程系 |
碩士 |
經歷
|
服務機關/單位 |
職稱 |
時間(起) |
時間(迄) |
1 |
國立高雄科技大學 |
教授 |
99.8 |
109.7 |
2 |
國立高雄第一科技大學 |
副教授 |
89.8 |
99.7 |
3 |
國立新加坡大學 |
Senior Lecturer |
83.7 |
89.7 |
期刊論文
|
發表期刊論文 |
1 |
Li-Chung Chao, Shinn-Jye Liaw (2019). Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008-1~10. (SCI). |
2 |
Li-Chung Chao, Chiang-Pin Kuo (2018). Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117-1~8. (SCI). |
3 |
Li-Chung Chao, Hsien-Tse Chen (2015). Predicting project progress via estimation of S-curve's key geometric feature values. Automation in Construction, 57, 33-41. (SCI) |
4 |
Li-Chung Chao, Lai-Chen Cheng (2014). ANP model for evaluation of false-work systems for cast-in-place cantilever bridges. Procedia Engineering, 85, 104-112. (EI). |
5 |
Li-Chung Chao, and Chih-Sheng Hsiao (2012). Fuzzy model for predicting project performance based on procurement experiences. Automation in Construction, 28, 71-81. (SCI) |
6 |
晁立中, 蕭志勝 (2012). 預估營建專案採購績效:以台電變電所工程為例。中國土木水利工程學刊, 第二十四卷, 第一期, 65-76. (EI) |
7 |
Li-Chung Chao, Ching-Fa Chien (2010). A model for updating project S-curve by using neural networks and matching progress. Automation in Construction, 19(1), 84-91. (SCI) |
8 |
Li-Chung Chao (2010). Estimating project overhead rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), 287-299. (EI) |
9 |
Li-Chung Chao, Ching-Fa Chien (2009). Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), 169-177. (SCI) |
10 |
Li-Chung Chao, Chang-Nan Liou (2007). Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), 835-843. (EI) |
11 |
Li-Chung Chao (2007). Fuzzy logic model for determining minimum bid markup. Computer-Aided Civil and Infrastructure Engineering, 22(6), 449-460. (SCI) |
12 |
Li-Chung Chao, Sung-Lin Hsueh (2006). Assessing project schedule risk with contingent tasks by spreadsheet-based simulation. Cost Engineering, 48(3), 11-20. (EI) |
13 |
Li-Chung Chao (2001). Assessing earth-moving operation capacity by neural network-based simulation with physical factors. Computer-Aided Civil and Infrastructure Engineering, 16(4), 287-294. (SCI) |
科技部研究計畫
|
計畫名稱 |
計畫日期(起) |
計畫日期(迄) |
擔任工作 |
1 |
兼顧得標機會、虧損風險、和廠商營運需求來決定公共工程標價下限 |
108.8 |
109.7 |
主持人 |
2 |
納入投標立場來決定管理費連同利潤之比例的競標模式 |
105.8 |
106.7 |
主持人 |
3 |
標價中間接成本及利潤合併比例之決定 |
104.8 |
105.7 |
主持人 |
4 |
藉S曲線關鍵幾何特徵值之估計來預測專案進度 |
102.8 |
103.7 |
主持人 |
5 |
以網路程序分析法評定建案選項優先次序 |
101.8 |
102.7 |
主持人 |
6 |
營建公司經營績效評比及目標設定:以資料包絡分析為基礎的方法 |
100.8 |
101.7 |
主持人 |
7 |
以組織記憶為基礎的採購及選商方式績效預估 |
97.8 |
98.7 |
主持人 |
8 |
預估專案S曲線的多因子非線型模式 |
96.8 |
97.7 |
主持人 |
9 |
估計專案間接成本對直接成本比例之計算模式 |
95.8 |
96.7 |
主持人 |
10 |
統包標案之標價決策模式 |
94.8 |
95.7 |
主持人 |
11 |
以虧損風險為考量基礎的機率競標模式 |
93.8 |
94.7 |
主持人 |
12 |
高進度風險專案使用替代採購方式之評估高進度風險專案使用替代採購方式之評估 |
92.8 |
93.7 |
主持人 |
13 |
激烈競爭下之標價決策模式 |
91.8 |
92.7 |
主持人 |
14 |
量化進度風險以協助統包專案之規劃量化進度風險以協助統包專案之規劃 |
90.8 |
91.7 |
主持人 |